5 MW of liquid-cooled compute in Portugal
Campus I is two three-storey concrete frames that are already built. Ten 500 kW pods go in over three phases, and each pod earns from the day it goes live.
The EU wants three times its data-centre capacity. On current plans it gets about 70% more by 2030. A new grid connection in the main hubs takes 7 to 10 years.
EU capacity gap in 2030
Data-centre electricity use worldwide, now to 2030
415 TWh
~945 TWh
Europe's share of the world's operational AI compute, about 2 GW
- European Commission AI Continent Action Plan: the EU aims to triple data-centre capacity.
- IEA Overcoming energy constraints is key to Europe's data-centre goals. 18 Nov 2025.
- Ember Grid congestion threatens the rollout of new data centres.
- Bruegel Capital alone will not close Europe's AI compute shortfall. 10 Sep 2026.
- Reuters Where new capacity lands is being decided by the grid. 18 Jun 2025.
The concrete is done. Each frame has three storeys of reinforced concrete with waffle slabs, and its column grid takes a 40-ft pod directly.
- Left to do
- Slab strengthening, medium-voltage power, cooling pipework, security
- Time per pod
- 10–16 weeks to build, 7–10 days to install, 3–5 days to commission
- First revenue
- From the first pod. There is no wait for the building to be finished.
One pod is a 40-ft container with 500 kW of IT capacity. Racks, power and cooling leave the factory as one unit.
Render, pod with one side removed
- 1
Up to 150 kW per rack
Cold-plate liquid cooling, built for dense AI training and inference hardware.
- 2
PUE of 1.20 or lower
About 40% less cooling energy than air. Clients pay for electricity at cost, outside the service fee.
- 3
Pods can move
A pod is plant, not building fabric. It can go to another site.



Base case: 10 pods, 5.0 MW IT. The renders show more pod positions than the base case.
Campus I reaches 5 MW in three phases. Each pod earns from the day it goes live.
Quarters are counted from the project start: quarter 1 is months 1 to 3, quarter 3 is months 7 to 9, and quarter 5 is months 13 to 15.


Three capabilities that rarely sit in one place. A team that has built AI businesses, engineers who have run hyperscale data centres, and the local access to land them in Portugal.
Management
Founders who have built AI and fintech companies and raised money from institutional investors.
Build and operations
Senior engineers from Alibaba Cloud's data-centre organisation. They specify every BlueHarbor pod and run it 24/7.
Local access
The contacts that move grid access, permits and incentives in Portugal.